From development to realisation
Concept
The requirements for the necessary main components and machines are defined based on the process-engineering process. Of course your specific execution requirements – e.g. your specifications – are taken into account here. From this, we then develop a system concept in the form of a flowchart or a pipeline and instrumentation diagram (PID). Possible interfaces to other equipment can then be specified as well. A detailed offer with the technical and commercial conditions completes the concept phase.